(OPS205) Combined Cycle Familiarization/Operations
COMBINED CYCLE FAMILIARIZATION AND OPERATION
Description
Request for Quote
The Combined Cycle Familiarization and Operation training program is designed to provide a basic understanding of the equipment and its associated auxiliary systems. The training will support the installation, startup, and operations of commercial power projects. The training integrates a combination of classroom instruction and associated system walk downs. Classroom instruction, while preferred at the customer site, may be accomplished at Siemens Energy training facilities. Plant walk downs can occur only at the customer site. Operations and maintenance personnel perform functions vital to the safe and efficient operation of a power plant. In order to fulfill their job responsibilities, they require an understanding of the Siemens Energy turbine-generator system and its interrelationship with the associated balance of plant systems. The goal of the combined cycle training program is to provide this understanding customized to each customer’s specific site. All training programs are limited to the Siemens Energy scope of supply.
Course Content
The following topics are representative of those covered in the gas turbine, steam turbine and associated systems phase of the combined cycle training program. Actual course content will be customized to the specific plant configuration.
Gas turbine and associated systems phase:
-
Gas Turbine Familiarization
-
Power plant overview
-
KKS Equipment Identification System
-
Safety precautions
-
Gas Turbine (applicable model)
-
Basic gas turbine description
-
Associated Systems (as applicable)
-
Fire protection
-
Electrical distribution
-
Heating, ventilation & air conditioning
-
Lubricating oil
-
Control (Hydraulic) oil
-
Fuel (fuel gas and/or fuel oil)
-
Combustor (conventional, DLN, ULN)
-
Emission
-
Power augmentation
-
Compressor water wash
-
Starting system
-
Inlet air filtration
-
Evaporative cooling/ wet compression/ inlet fogging
-
Instrument air
-
Turbine air
-
Generator and exciter
-
Generator cooling
-
Hydrogen cooled generator support
-
DCS Control
-
Integrated System Operations
-
Process control drawings and control logic diagrams
-
Pre-start checks/Ready to start permissives
-
Normal startup and shutdown
-
Load changing procedures
-
Operational checks/ parameters/ limits
-
Abnormal conditions
-
Combustion system operations & control
-
Temperature monitoring & control
-
System functional operation & control
-
Maintenance Considerations
-
Service bulletins (Introduction)
-
Warranty policies/ typically requested information
Steam Turbine, Balance of Plant and associated systems phase:
Steam Turbine and Balance of Plant Equipment Familiarization (Siemens Energy scope)
-
Steam Cycle Overview
-
Main Condenser and Evacuation System (functional operation)
-
Condensate System (functional operation)
-
Heat Recovery Steam Generator
-
Boiler Feedwater System (functional operation)
-
Steam Systems (functional operation)
-
Auxiliary Boiler System
-
Steam Turbine Unit
-
Lubricating and Lift Oil System
-
Hydraulic Control Oil System
-
Turbine Seal Steam, Exhauster and Drain Systems
-
LOC and Exhaust Hood Spray Systems
-
Generator System
-
Generator Seal Oil System (Hydrogen Generator)
-
Generator Cooling System (Hydrogen or TEWAC)
-
Steam Turbine Protection
-
Automatic Turbine Tester (ATT)
-
Turbine Stress Evaluator (TSE)
-
Steam Turbine Operational Guidelines
-
Circulating Water and Chemical feed Systems
-
Auxiliary (Closed) Cooling Water Systems
-
HRSG / Steam Systems Chemical Feed, Sampling and Analysis
-
Cycle (Demin) Makeup Water Treatment and Storage
-
Electrical Distribution System for Balance of Plant
-
Plant Air Systems
-
Plant Fire Protection System
-
Plant Fuel Handling System
-
Raw and Portable Water Systems
-
Freeze Protection
-
Waste Collection & Treatment Systems
-
Continuous Emissions Monitoring System
-
Safety
-
Glossary of Terms
-
Steam Turbine and Balance of Plant Operation
-
Process control drawings and Control Logic Diagrams
-
BOP and Steam Turbine Systems Functional Operation & Control
-
BOP and Steam Turbine Pre-start Checks/ Start Permissives
-
BOP and Steam Turbine Normal Startup and Shutdown
-
BOP and Steam Turbine Operational Checks/ Parameters/ Limits